{"id":15782,"date":"2022-12-19T10:00:05","date_gmt":"2022-12-19T15:00:05","guid":{"rendered":"https:\/\/www.consigli.com\/?p=15782"},"modified":"2024-05-17T14:37:31","modified_gmt":"2024-05-17T18:37:31","slug":"pre-fabrication-for-expedited-delivery-colby-college-johnson-pond-houses","status":"publish","type":"post","link":"https:\/\/www.consigli.com\/pre-fabrication-for-expedited-delivery-colby-college-johnson-pond-houses\/","title":{"rendered":"Pre-fabrication for Expedited Delivery: Colby College, Johnson Pond Houses"},"content":{"rendered":"
At Colby College, the design-build Johnson Pond Houses project delivered a four-building student residence complex just fifteen months<\/em> from mere project conception. Comprised of pre-fabricated<\/a> structural units and pre-cast concrete foundation panels, the 40,000 sq. ft. facility houses 200 student beds.<\/p>\n When planning an aggressive project schedule, utilize repetitive design details to ensure quality and efficiency as multiple elements are built simultaneously off-site.<\/em><\/p>\n The concrete foundations at Johnson Pond Houses were designed to eliminate on-site formwork and ease transportation to site. Consigli\u2019s Virtual Design and Construction<\/a> (VDC) team developed 35 concrete panel shop drawings to be repeated for each building. Each panel included every penetration, lifting device, reinforcing detail and finishing requirement, with concealing joints between panels. Foundations Engineer of Record Trillium Engineering reinforced details and accelerated drawing approvals.<\/p>\n To confirm there were no conflicts between the concrete, volumetric modular structural unit models, embeds and site work, each panel type was digitally modeled and clash-detected with the structural unit models. Drain lines, HVAC system louver openings, boiler vents, sprinkler drains and electrical conduits were modeled and sleeved in the panels based on the 3D model of Mechanical, Electrical, Plumbing and Fire Protection<\/a> (M\/E\/P\/FP) systems.<\/p>\n <\/p>\n KBS Builders Inc. (KBS) pre-fabricated structural units that allowed in-factory framing, electrical, plumbing and fire protection installation. Consigli and the Kaplan Thompson Architects design team engaged M\/E\/P\/FP design-build subcontractors for weekly coordination meetings to advance the design with KBS. With 18 structural units per building repeated across four houses, coordination and review of KBS shop drawings were required twelve weeks prior to on-site delivery.<\/p>\n The design-build delivery of the four repetitive buildings allowed the team to rapidly adjust design details and apply adjusted concepts from the first building to the last in real time for schedule and quality improvements. The structural units were designed to deliver nearly complete interiors for all spaces except the corridors and pre-cast basements.<\/p>\n Traditional on-site construction limits simultaneous trades on site, due to its inherent sequential nature (first comes site work, then foundation, framing and so on). Pre-fabrication supports faster, higher-quality construction by simultaneously managing multiple trades and delivering materials to site only when installation-ready.<\/em><\/p>\nDesign<\/strong><\/h2>\n
Pre-cast Concrete Foundations<\/h3>\n
Volumetric Modular Structural Units<\/h3>\n
Pre-fabrication<\/strong><\/h2>\n
Pre-cast Concrete Foundations<\/h3>\n